PLN and ITB Geothermal Organize Field Trip Excursion
The PLN Geothermal Field Trip Excursion was held over five days, from March 6 to March 10, 2023. The locations included the Exploration Room at the Energy Building, 2nd floor, Tangkuban Perahu, and the Patuha Geothermal Power Plant (PLTP) operated by Geo Dipa Energi. The program ran daily from 08:00 to 17:00, except for the […]