Home > Information > Collaboration
Research Collaboration
| No. | Collaboration | Year |
|---|---|---|
| 1 | GEOCAP Geothermal Capacity Building Program Indonesia-Netherland Consortium. Netherland Consortium-LAPI ITB | 2014-2017 |
Project Collaboration
Since 1990 ITB has been involved in various geothermal projects. Collaboration is mostly with PERTAMINA.
| No. | Projects | Year |
|---|---|---|
| 1 | Feasibility Study of Ulumbu and Metaloko Geothermal Power Plants Project Finance By PLN Budget. PT Kwarsa Hexagon – LAPI ITB | 2016-2017 |
| 2 | Services Evaluation Study Prospects and Future Plans WKP Geothermal Arjuno Wilerang. PT GEODIPA ENERGY – LAPI ITB | 2016-2017 |
| 3 | GEOTHERMAL TECHNICAL CONSULTANT SERVICES TO EVALUATE ITS ACQUISITION OPPORTUNITIES IN THE FIELD OF GEOTHERMAL. LAPI ITB – PERTAMINA Upstream Business Development | 2016 |
| 4 | Feasibility of Mineral Exploration Drilling in the Vicinity of Geothermal System. PT LAPI ITB – PT AR (G-Resources) | 2014-2016 |
| 5 | Montelago 3D Reservoir, Resource Asessement and Well Targeting. Emerging Power-LAPI ITB | 2014-2016 |
| 6 | Quick Scan Study of Hot Sedimentary Aquifer in Jakarta. PERTAMINA CORPORATE-LAPI ITB | 2014 |
| 7 | Structural Geological Mapping and Delineation of Permeability of Patuha Field. GEODIPA-LAPI ITB | 2014 |
| 8 | Geochemical Survey of Graho Nyabo Geothermal Prospect, Jambi. TBU – EDC | 2013 |
| 9 | Asessment of Tenerife Island Geothermal Prospect. If Technology – Repsol | 2013 |
| 10 | Preliminary Survey Stages of Mt Galunggung Geothermal Prospect. Kinan Energy – LAPI ITB | 2012-2013 |
| 11 | Exploration of Montelago Geothermal Project, Mindoro Philipines. Emerging Power Consortium (Phillipines-Netherland) – LAPI ITB | 2012-2013 |
| 12 | Remote Sensing Study of Gede Pangrango Geothermal Prospect. PERTAMINA (Persero) | 2013 |
| 13 | Geothermal Reservoir Assessment of Lahendong. PT LAPI ITB – PT PERTAMINA Geothermal Kamojang | 2012-2013 |
| 14 | Geothermal Reservoir Assessment of Kamojang. PT LAPI ITB – PT PERTAMINA Geothermal Kamojang | 2012 |
| 15 | Geothermal Exploration Overview of Katwe Prospect Uganda (a desk study). IF Technology Consortium – Netherland and LAPI ITB | 2012 |
| 16 | Geothermal Prospect Evaluation in Java and Bali. PT LAPI ITB – PT PERTAMINA (Persero) | 2011-2012 |
| 17 | Geochemistry of Sidoarjo Mud Volcano. ITB – BPLS | 2011 |
| 18 | Geothermal Exploration of Rajabasa and Rantaudadap, Sumatera. LAPI ITB – SUPREME ENERGY | 2011 |
| 19 | Geothermal Exploration of Muaralaboh, Sumatera. LAPI ITB – SUPREME ENERGY | 2010 |
| 20 | Geothermal Geochemical Exploration of Simbolon-Samosir, North Sumatera. PT Optima Nusantara Energy | 2010 |
| 21 | Numerical Modeling of Kamojang, Sibayak, and Lahendong Geothermal Field Development. LAPI ITB – PERTAMINA GEOTHERMAL | 2009 |
| 22 | Numerical Modeling of Wayang Windu Geothermal Field Development. LAPI ITB – STAR ENERGY / MAGMA NUSANTARA LIMITED | 2008-2009 |
| 23 | Determination of Drilling Pad, Modeling/Design and Reconstruction of Exploration Well for Accelerating Geothermal Development in Sulawesi Island, Gada Energi ITB, Minerba Pabum MEMR Indonesia | 2008-2009 |
| 24 | Evaluation of Geothermal Cisolok-Cisukarame, Tampomas and Tangkuban Perahu. Tender Document Preparation, BUMD Jabar | 2008 |
| 25 | Reservoir Simulation of Kamojang Geothermal Field, PERTAMINA | 2006 |
| 26 | Reservoir Simulation of Lahendong Geothermal Field, PERTAMINA | 2006 |
| 27 | Upgrading Management Information System of Kamojang Geothermal Field, PERTAMINA | 2004 |
| 28 | Valuation of Geothermal Resources in West Java, A Study for West Java Energy and Mining Office | 2003 |
| 29 | Reserve Re-evaluation of Sarulla Geothermal Project, North Sumatera, for PERTAMINA | 2003 |
| 30 | Re-Evaluation Techno-Economics of Wayang Windu (West Java) Geothermal Field (Work for PERTAMINA | 2003 |
| 31 | Development of Smart Tough2 (Tough2 Post Processor) & Tough2 Interface and their Application for Analyzing Reservoir at Kamojang Field, PERTAMINA | 2002 |
| 32 | Development of Integrated Reservoir Information System of Kamojang Geothermal Field, PERTAMINA | 2000 |
| 33 | Interference Test in Sibayak (North Sumatere) Geothermal Field, PERTAMINA | 1998 |
| 34 | Data Preparation and Software Application for Simulating the Behavior of Lahendong Geothermal Field. PERTAMINA | 1997 |
| 35 | Reservoir Simulation Study for Electrical Power Expansion of Kamojang Geothermal Field, PERTAMINA | 1996 |
| 36 | Well bore Simulation for Investigating the Possibility of Drilling Big hole at Lahendong Geothermal Field, PERTAMINA | 1996 |
| 37 | Reservoir Simulation Study for Applying Big holes in Sibayak Geothermal Field, PERTAMINA | 1995 |
| 38 | Sibayak Interference Test Interpretation, PERTAMINA | 1995 |
| 39 | Wellbore Simulation for Investigating the Possibility of Drilling Big hole at Kamojang Geothermal Field, PERTAMINA | 1994 |
| 40 | Reservoir Simulation Study for The Re-injection of Condensed Water in Kamojang Geothermal Field. PERTAMINA | 1993 |
| 41 | Geothermal Reservoir Simulation Study for Dieng Field, PERTAMINA | 1992 |
| 42 | Interference Tests at Kamojang Geothermal Field, PERTAMINA | 1990 |