Enter your keyword

Collaboration

Research Collaboration
No List of Research CollaborationYear
1GEOCAP Geothermal Capacity Building Program Indonesia-Netherland Consortium. Netherland Consortium-LAPI ITB2014-2017
2Pedoman Kerja Teknik Panas Bumi, Pertamina.2016
3JASA KONSULTANSI PENDAMPINGAN PROSES EVALUASI DOKUMEN DAFTAR PENYEDIA TERSELEKSI (DPT)
MITRA PENGEMBANGAN WILAYAH KERJA PANAS BUMI (WKP) PLN, PLN GG
2019
4WELL INTERVENTION SUMUR PRODUKSI ULUMBU DENGAN ACID STIMULATION, PLN GG2020

 

Project Collaboration

Since 1990 ITB has been involved in various geothermal projects. Collaboration is mostly with PERTAMINA.

NoList of Geothermal ProjectYear
1Due Diligence Team for Rajabasa Power Purchase Agreement, a work for PT. PLN-EBT.2021-2022
2Geoscience Study, Well Targeting, and Conceptual Design for Exploration Drilling to Develop Gunung Sirung Power Plant (5 MW)2021
3Peer Review of Data Acquisition Results, Geoscience Data Integration and Geothermal Well Targeting of Bittuang and Tampomas Geothermal
Fields
2021
4Study of Cost and Benefit Analysis for Continuation of Power Purchase Agreement (PPA) in Rajabasa Power Plant (2x110 MW)2021
5Research collaboration between ITB, KIT, and PLN for Geothermal Exploration on Flores Island (Tulehu and Ulumbu Geothermal Field) Unlocking Generation II
Resources of Indonesia
2020
6Jul 2020-present Detailed Structural Geology and Hydrothermal Alteration Mapping in Wapsalit Geothermal Prospect Area for ORMAT Indonesia2020
7Reviewer for Cimanggu Prospect, a work for PT. Geodipa (Persero)2020
8Reviewer for Candradimuka Prospect, a work for PT. Geodipa (Persero) 2020
9Reviewer for Sikidang Prospect, a work for PT. Geodipa (Persero)2020
10Due Diligence Team for Muaralaboh Power Purchase Agreement, a work for PT. PLN-EBT.2020
11Consultant for Huu Daha Exploration Program, a work for PT. Sumbawa Mining.2020
12Reviewer for PLN-EBT on Acidizing Program (RFP Document, PQ Document, and Cost Estimates) in Ulumbu Geothermal Field Well ULB-3.2020
13WELL INTERVENTION SUMUR PRODUKSI ULUMBU DENGAN ACID STIMULATION, PLN GG
2020
14Dec 2019-Jan 2020 Geoscience Survey at Ulumbu Geothermal Field2019-2020
15Reviewer for PLN-GG on Plan to Develop Ulumbu Mataloko, a work for PT. PLN-GG.2019-2020
16Geoscience Survey at Mataloko Geothermal Field2019
17Apr-Dec 2019 Geological and Geochemical Survey at Klabat-Wineru Geothermal Project2019
18Integrated Intensive
Literature Study for the Hu’u Geothermal Resource Evaluation Project Island of
Sumbawa, Indonesia
2019
19Consultant for Government Drilling Assignment, a work for PT. Geodipa (Persero).2019
20JASA KONSULTANSI PENDAMPINGAN PROSES EVALUASI DOKUMEN DAFTAR PENYEDIA TERSELEKSI (DPT)
MITRA PENGEMBANGAN WILAYAH KERJA PANAS BUMI (WKP) PLN, PLN GG
2019
21Consultant Team for Feasibility Study of Dieng and Patuha, a work for PT. Geodipa (Persero).2018-2019
22Nov-Dec 2018 Geology and Geochemistry of Arjuno- Welirang Geothermal Prospect, East Java2018
23Geochemistry Survey: Fumarole Gas Sampling in Ungaran, Central Java2018
24Geochemical Field Sampling and Geological Research in Pusuk Bukit and Simbolon-Samosir Geothermal Area2018
25Consultant Team for PLN Strategic Partners Evaluation, a work for PT. PLN (Persero).2018
26Nov 2017-Mar 2018 Remote Sensing and Field Check for Structural, Lithology and Alteration Mapping of Muara Laboh Geothermal Field Project.2017-2018
27Feasibility Study of Ulumbu and Metaloko Geothermal Power Plants Project Finance By PLN Budget. PT Kwarsa Hexagon – LAPI ITB2016-2017
28Services Evaluation Study Prospects and Future Plans WKP Geothermal Arjuno Wilerang. PT GEODIPA ENERGY – LAPI ITB2016-2017
29Chemical Fluid Evolution and Geology of Montelago Geothermal Field, Philippine by analyzing petrography, XRF, XRD, SEM, fluid inclusion and fluid
chemistry.
2016
30GEOTHERMAL TECHNICAL CONSULTANT SERVICES TO EVALUATE ITS ACQUISITION OPPORTUNITIES IN THE FIELD OF GEOTHERMAL. LAPI ITB – PERTAMINA Upstream Business Development2016
31Pedoman Kerja Teknik Panas Bumi, Pertamina.2016
32Feasibility of Mineral Exploration Drilling in the Vicinity of Geothermal System. PT LAPI ITB – PT AR (G-Resources)2014-2016
33Montelago 3D Reservoir, Resource Asessement and Well Targeting. Emerging Power-LAPI ITB2014-2016
34Structural Geologist for Patuha Geothermal Prospect Project, West Java2014
35“Quick Scan Geothermal Cooling for Pertamina Energy Tower”, a work for Pertamina.2014
36Quick Scan Study of Hot Sedimentary Aquifer in Jakarta. PERTAMINA CORPORATE-LAPI ITB2014
37Structural Geological Mapping and Delineation of Permeability of Patuha Field. GEODIPA-LAPI ITB2014
38“Well Targeting for Dieng and Patuha Field”, a work for PT Geodipa Energi.“Resource Assessment of Montelago Prospect, The Philippines”,a work for Emerging Power International, The Philippines.2013-2014
39Dec 2013 Geochemical Survey in Grahu Nyabu Geothermal Prospect Project, Jambi2013
40Geochemical Survey of Graho Nyabo Geothermal Prospect, Jambi. TBU – EDC2013
41Asessment of Tenerife Island Geothermal Prospect. If Technology – Repsol2013
42Preliminary Survey Stages of Mt Galunggung Geothermal Prospect. Kinan Energy – LAPI ITB2012-2013
43Exploration of Montelago Geothermal Project, Mindoro Philipines. Emerging Power Consortium (Phillipines-Netherland) – LAPI ITB2012-2013
44“Technical and Economic Analysis of Workover Program in Dieng Geothermal Field”, a work for PT Geodipa Energi.2013
45Remote Sensing Study of Gede Pangrango Geothermal Prospect. PERTAMINA (Persero)2013
46Geothermal Reservoir Assessment of Lahendong. PT LAPI ITB – PT PERTAMINA Geothermal Kamojang2012-2013
47“Evaluation of District Regulation which Discourages The Geothermal Investment Climate”, a work for Directorate of Geothermal, Ministry of Energy and Mineral Resources.2012
48“World Geothermal Laboratory”, a work for Directorate of Geothermal, Ministry of Energy and Mineral Resources.2012
49“Peer Review of Well Targetting of 8 Production and Injection Wells in Tompaso Geothermal Field”, a work for Pertamina Geothermal Energy.2012
50“Reservoir Re-Assessment of Kamojang Geothermal Field”, a work for Pertamina Geothermal Energy.2012
51“Reservoir Characterization, Wellbore and Reservoir Modeling of Lahendong Geothermal Field”, a work for Pertamina Geothermal Energy.2012
52Geothermal Reservoir Assessment of Kamojang. PT LAPI ITB – PT PERTAMINA Geothermal Kamojang2012
53Geothermal Exploration Overview of Katwe Prospect Uganda (a desk study). IF Technology Consortium – Netherland and LAPI ITB2012
54“Geothermal Prospects Evaluation in Java and Bali Islands”, a work for Pertamina.2011-2012
55Geothermal Prospect Evaluation in Java and Bali. PT LAPI ITB – PT PERTAMINA (Persero)2011-2012
56“Justification of Flow Capacity for Well HCE-29, 29A, 30 and 30A at Dieng Geothermal Field”, a work for PT Geodipa Energy.2011
57“Developing Flow Modelling Software (Wellbore, Pipeline and Power Plant) for Dieng Geothermal Field”, a work for PT Geodipa Energy.2011
58Geochemistry of Sidoarjo Mud Volcano. ITB - BPLS2011
59Geothermal Exploration of Rajabasa and Rantaudadap, Sumatera. LAPI ITB - SUPREME ENERGY2011
60“Power Plant Performance Test”, a work for Power Plant Kamojang Unit 4, Pertamina Geothermal Energy.2010
61“Evaluation of Exploration, Production, Injection and Make-Up Wells’ Capability at Lahendong Geothermal Field, North Sulawesi”, a study for Directorate General of Mineral, Coal, and Geothermal, Department of Energy and Mineral Resources.2010
62“Evaluation of Engineering Aspects and Electricity Price Escalation for Sarulla Geothermal Prospect in North Sumatera”, a work for PLN (State Utility Company), Directorate of Independent Power Producer.2010
63Geothermal Exploration of Muaralaboh, Sumatera. LAPI ITB - SUPREME ENERGY2010
64Geothermal Geochemical Exploration of Simbolon-Samosir, North Sumatera. PT Optima Nusantara Energy2010
65“Study of Financial/Business Aspects in Geothermal Electricity Sales Contract (ESC)”, a work for PLN (State Utility Company), Directorate of Independent Power Producer.2009-2010
66“West Java Gas Infrastructure Study”, a study for West Java Energy and Mining Office.2009
67“Reservoir Assessment of Lahendong Geothermal Field”, a work for Pertamina Geothermal Energy.2009
68“Valuation of National Wealth from Geothermal Sector”, a work for Directorate General of National Wealth, Ministry of Finance Republic of Indonesia.2009
69“Reservoir Assessment of Sibayak Geothermal Field”, a work for Pertamina Geothermal Energy.2009
70Numerical Modeling of Kamojang, Sibayak, and Lahendong Geothermal Field Development. LAPI ITB - PERTAMINA GEOTHERMAL2009
71Numerical Modeling of Wayang Windu Geothermal Field Development. LAPI ITB - STAR ENERGY / MAGMA NUSANTARA LIMITED2008-2009
72Determination of Drilling Pad, Modeling/Design and Reconstruction of Exploration Well for Accelerating Geothermal Development in Sulawesi Island, Gada Energi ITB, Minerba Pabum MEMR Indonesia2008-2009
73“Reservoir Modelling of Wayang Windu Geothermal Field”, a work for Magma Nusantara Ltd.2008-2009
74“Pricing of Brine for Direct Use and Small Scale Geothermal Plant”, a study for BPPT (Badan Pengkajian dan Penerapan Teknologi), Departement of Research and Technology.2008
75“Analysis of Gas Supply for Bandung Greater Area”, a study for West Java Energy and Mining Office.2008
76“Gas Market Assessment in Bandung Greater Area”, a study for West Java Energy and Mining Office.2008
77“Pre-feasibility Study of Gunung Gede Pangrango Geothermal Field”, a study for West Java Energy and Mining Office.2008
78Advisor for West Java Energy and Mining Office in Conducting Bid Process for 3 New Geothermal Concession in West Java: Tangkuban Parahu, Cisolok- Cisukarame, and Tampomas Geothermal Prospects.2008
79Reviewer for The Project Appraisal Document on A Proposed GEF Grant in The Amount of US$4 Million to The Republic of Indonesia for A Geothermal Power Generation Development Project, work for The WorldBank, April 2008.2008
80Reviewer for The Results of Completion Test Well UBL-01 and UBL-02 in Ulubelu Geothermal Field-Lampung, a work for PT Pertamina Geothermal Energy.2008
81Evaluation of Geothermal Cisolok-Cisukarame, Tampomas and Tangkuban Perahu. Tender Document Preparation, BUMD Jabar2008
82“Geothermal Reservoir Management and Monitoring”, a study for Directorate General of Mineral, Coal, and Geothermal, Department of Energy and Mineral Resources.2007
83“Optimization of Electricity Production from Brine Water in Salak, Wayang Windu, and Dieng Geothermal Field”, a study for Directorate General of Mineral, Coal, and Geothermal, Department of Energy and Mineral Resources.2007
84“Substitution of Diesel Power Plant Using Geothermal Power Plant”, a study for Directorate General of Mineral, Coal, and Geothermal, Department of Energy and Mineral Resources.2007
85“Steam Pricing”, a study for Directorate General of Mineral, Coal, and Geothermal, Department of Energy and Mineral Resources.2007
86Optimisation of Chemical Consumption at West Area Field, BOB PT Pertamina Persero-PT BSP.2006-2007
87Huff and Puff at West Area Field, BOB PT Pertamina Persero-PT BSP.2006-2007
88“Reservoir Simulation for Kamojang and Lahendong Geothermal Field”, a study for Pertamina Geothermal Energy.2006
89“Pre-feasibility Study of Sangkan Hurip and Ciater Geothermal Field”, a study for West Java Energy and Mining Office.2006
90“Preliminary Design Power Plant Binary Cycle for Lahendong Geothermal Field”, a work for Pertamina Geothermal Energy.2006
91Reservoir Simulation of Kamojang Geothermal Field, PERTAMINA2006
92Reservoir Simulation of Lahendong Geothermal Field, PERTAMINA2006
93Pre-feasibility Study of Tangkuban Perahu, Cisolok-Cisukarame and G. Tampomas Geothermal Prospect, a study for West Java Energy and Mining Office.2005
94“Study of Small Scale Geothermal Power Plant”, a study for West Java Energy and Mining Office.2005
95Reviewer for Pipeline Design of 2x5 MW Sibayak Field North Sumatera, a work for Sibayak Geothermal Area, Pertamina Geothermal Energy.2005
96“Feasibility Study of Kamojang, Ulubelu, Lumut Balai and Lahendong Field”, a work for Pertamina Geothermal Energy.2005
97“Upgrading “Integrated Reservoir Information Systems (IRIS)" a work for Kamojang Geothermal Area, Pertamina Geothermal Energy.2004-2005
98“Evaluation of Result from Re-test of Wells at Sibayak Geothermal Area, North Sumatera”, a work for Pertamina Geothermal Energy.2004
99Assessor for Competency Level Test, Geothermal Module at Chevron Texaco Energy Indonesia Ltd in cooperation with IATKI (Association of Indonesian Electrical Experts).2004
100Upgrading Management Information System of Kamojang Geothermal Field, PERTAMINA2004
101Head of Steam Flow and Power Plant Optimization Research in OPPINET (Optimisation on Gas and Oil Transmission and Distribution Pipeline Network), a consortium between ITB and Oil and Gas Companies in Indonesia.2003-2008
102“Re-evaluation of Engineering and Economic Aspects for Wayang Windu Geothermal Project, West Java” a study for Pertamina Geothermal Energy.2003
103“Reserve Re-evaluation of Sarulla Geothermal Project, North Sumatera”, a study for Pertamina Geothermal Energy.2003
104Valuation of Geothermal Resources in West Java, A Study for West Java Energy and Mining Office2003
105Reserve Re-evaluation of Sarulla Geothermal Project, North Sumatera, for PERTAMINA2003
106Re-Evaluation Techno-Economics of Wayang Windu (West Java) Geothermal Field (Work for PERTAMINA2003
107“Inventarisation and Valuation of Geothermal Resources in West Java”, a study for West Java Energy and Mining Office.2002-2003
108Teaching Assistant of Production Operation Management for Pertamina School, cooperation between Pertamina and the University of Tulsa.2002
109“Building An Interface of I-TOUGH2 Reservoir Simulator and Its Application for Kamojang Reservoir Modeling”, a work for Kamojang Geothermal Area, Pertamina Geothermal Energy.2002
110Committee of Indonesian National Standard in Standard Procedure of Geothermal Production Test.2002
111“Gas Price Formulation”, a study for Directorate General of Oil and Gas, Department of Energy and Mineral Resources.2002
112“Feasibility Study of Chauk & Yenangyaung Field in Myanmar”, a work for ELNUSA Geosain2002
113Development of Smart Tough2 (Tough2 Post Processor) & Tough2 Interface and their Application for Analyzing Reservoir at Kamojang Field, PERTAMINA2002
114“Horizontal Test for well KMJ-73 & KMJ-74 at Kamojang Geothermal Field”, a work for Kamojang Geothermal Area, Pertamina Geothermal Energy.2001-2002
115“Cost Recovery for Oil and Gas Industries in Indonesia”, a study for DKPP (Board of Government Commissioners for Pertamina).2001
116Committee of Indonesian National Standard in Geothermal Electricity Conversion and Geothermal Production Test Report.2001
117Committee of Indonesian National Standard in Geothermal Production Test.Geothermal Reservoir Simulation Using TOUGH2, professional assistance for Amoseas Indonesia.2000
118“Analysis of Government Incentive to Reduce Gas Price for Domestic Market”, a study for Directorate General of Oil and Gas, Department of Energy and Mineral Resources.2000
119“Analysis of Oil and Gas Contract Systems”, a study for Directorate General of Oil and Gas, Department of Energy and Mineral Resources.2000
120Development of Integrated Reservoir Information System of Kamojang Geothermal Field, PERTAMINA2000
121"Cost Optimisation and Reduction of Exploration Cost in Geothermal Projects", a study for Directorate General of Oil and Gas, Department of Energy and Mineral Resources.1998
122Interference Test in Sibayak (North Sumatere) Geothermal Field, PERTAMINA1998
123"Preparation and Utilisation of Reservoir Simulation Software (using TOUGH2 Geothermal Reservoir Simulator from Lawrence Berkley Laboratory) and Reservoir Evaluation for Lahendong Geothermal Field, North Sulawesi" a work for Pertamina Geothermal Energy.1997-1998
124"Indonesian Geothermal Data Base Management System", a work for Directorate General of Oil and Gas, Department of Energy and Mineral
Resources
1997-1998
125Data Preparation and Software Application for Simulating the Behavior of Lahendong Geothermal Field. PERTAMINA1997
126Reservoir Simulation Study for Electrical Power Expansion of Kamojang Geothermal Field, PERTAMINA1996
127Well bore Simulation for Investigating the Possibility of Drilling Big hole at Lahendong Geothermal Field, PERTAMINA1996
128Reservoir Simulation Study for Applying Big holes in Sibayak Geothermal Field, PERTAMINA1995
129Sibayak Interference Test Interpretation, PERTAMINA1995
130Wellbore Simulation for Investigating the Possibility of Drilling Big hole at Kamojang Geothermal Field, PERTAMINA1994
131Reservoir Simulation Study for The Re-injection of Condensed Water in Kamojang Geothermal Field. PERTAMINA1993
132Geothermal Reservoir Simulation Study for Dieng Field, PERTAMINA1992
133Interference Tests at Kamojang Geothermal Field, PERTAMINA1990

 

Training PT. Gada Energi
NoWork Package NameBid/Sub Sector of WorkLocationTask Giver/Service User
2Pengadaan Pembelajaran Geothermal Field Trip Excursion PT PLN (Persero) UPDL MakassarTrainingBandungPT. PLN (Persero)
3Reservoir Simulation Training, pada tanggal 16 – 20 Januari 2023TrainingBandungPT. Pertamina Geothermal Energy
5Penyelenggaraan Webinar Series Renewable Energy Panas Bumi Batch.2TrainingJakartaPT. PLN (Persero)
6Penyelenggaraan Webinar Series Renewable Energy Panas Bumi Batch.1Training JakartaPT. PLN (Persero)
7Jasa Inhouse Training Program Geothermal Series ITB Pekerja PGETraining GeothermalJakartaPT. Pertamina Geothermal Energy
8Online Training Program Training Geothermal ITB yang akan dilaksanakan pada tanggal 17, 18, 24, dan 25 September 2021Training JakartaDirektur Panas Bumi, Direktorat Jenderal EBTKE, KESDM
9Pengadaan Jasa Training Pemodelan Keuangan GeothermalTraining JakartaPT. EMP Energi Terbarukan
10Penyediaan Jasa Pelatihan untuk Personil O&MTraining Jakarta - IndonesiaPT. Supreme Energy Muara Laboh
11Pelatihan Macro Excel for Geothermal Production EngineeringTraining Geothermal Lab 2nd Floor, Energy Building, ITBPT. Pertamina Geothermal Energy
12Inhouse - Jasa Training Thermodinamika dan Fisika Industri PT. Geo Dipa Energi (Persero) Unit Patuha Batch II Training GeothermalPT. Geo Dipa Energi (Persero) Unit PatuhaPT. GEO DIPA ENERGI
14Geothermal Project Management Training (Batch II)Jasa Pendidikan
(In-House)
Jakarta - IndonesiaPT. GEO DIPA ENERGI
16Inhouse - Jasa Training Thermodinamika dan Fisika Industri PT. Geo Dipa Energi (Persero) Unit Patuha Training GeothermalPT. Geo Dipa Energi (Persero) Unit PatuhaPT. GEO DIPA ENERGI
24Geothermal Project Management Training (Batch I)Jasa Pendidikan
(In-House)
Jakarta - IndonesiaPT. GEO DIPA ENERGI
26Training : Sub-Surface Engineering Training GeothermalUmumUmum
28Training on Macro Excel for Geothermal ApplicationTraining GeothermalUmumUmum
29Training : Modul E-02 Geothermal Geoscience Data Evaluation, Conceptual Model, Well Targeting and Preliminary Resource Assessment Jasa Pendidikan
(In-House)
Jakarta - IndonesiaPT. Pertamina Geothermal Energy
30Training : Modul E-09 Geoscience Data Modelling of Geothermal SystemJasa Pendidikan
(In-House)
Jakarta - IndonesiaPT. Pertamina Geothermal Energy
31Pelatihan Geothermal Power Plant Operation And Maintenance Untuk PLTP Ulumbu Dan PLTP MatalokoJasa Pendidikan
(In-House)
Jakarta - IndonesiaPT COGINDO DAYABERSAMA
32Training : Introduction to Geothermal Reservoir ModelingJasa Pendidikan
(In-House)
Bandung - Jawa BaratPT. Jasa Daya Chevron
33Training : Introduction to Geothermal Reservoir ModelingJasa Pendidikan
(In-House)
Bandung - Jawa BaratBUT.Chevron Geothermal Salak, Ltd
34Training : Introduction to Geothermal Reservoir ModelingJasa Pendidikan
(In-House)
Bandung - Jawa BaratBUT.Chevron Geothermal Indonesia, Ltd